Sumul Dairy
Inauguration of Cattle feed Plant
Client:
Duration, Year & Location:
Description
Inauguration of Cattle feed Plant and Launch of various products of SUMUL by Hon’ble Prime Minister. Launch of various projects of Irrigation Dept.
Scope of Work
- Executed on a turn-key basis with 32 sound towers with line array system, 52 LED screens of various sizes (from 12’ x 52’ to 8’ x 12’ )
- 20000 RmtMs Pipe/Wire mesh Barricading
- PM/PMO/CM Air Conditioning Lounge
- Complete Electrification, Air Cooler, Flower decoration, Toilet facility etc.
- Time to completion : 15 days
- Capacity 125000 persons
- 40m x 500m hangers 3 nos. (61200 Sqmtr)
Event Highlights
Around 5 lakh people visited the event
Nine free langars over different locations served close to 3 lakh believers every day
More than 10,000+ volunteers contributed at the langar